
- IMG 2905
- IMG 2916
- IMG 2907
- PXL 20221014 145627667
The second beam holding up the stairs would collapse soon. - IMG 2908
- IMG 2906
- PXL 20221014 135830695.MP
Still more rot. The rest of the wall will be removed. - PXL 20221014 145641193
Re-building has begun. - PXL 20221014 124619493
The outside walls are damaged as well. - IMG 2909
- PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed. - PXL 20221014 135824201
First beam gone, second braced for removal. - PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too. - PXL 20221006 154422663
The top of the post was a bit better because it was the bottom that sat in the water that couldn't escape. - PXL 20221006 154445824
The beam is in bad shape and with the post gone would collapse if not taken care of soon.