
- PXL 20221007 142047567
And the damage continues. - PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top. - PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too. - PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too. - IMG 2059
- IMG 2067
- PXL 20221014 135824201
First beam gone, second braced for removal. - PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed. - IMG 2069
- IMG 2068
- IMG 2063
- IMG 2065
- PXL 20221014 124619493
The outside walls are damaged as well. - PXL 20221014 145641193
Re-building has begun. - IMG 2070