PXL 20221007 142047567
And the damage continues.
PXL 20221014 135830695.MP
Still more rot. The rest of the wall will be removed.
PXL 20221006 154422663
The top of the post was a bit better because it was the bottom that sat in the water that couldn't escape.
PXL 20221006 194642176.MP
The damage goes throughout the wall.
PXL 20221014 135824201
First beam gone, second braced for removal.
PXL 20221006 170853274
Some help was added. The dip in the deck is resolved.
PXL 20221006 194725748
Yes, that crowbar was easily pushed through the beam.
PXL 20220721 145455644
This is how it was discovered. The Hardyboard had broken off revealing that the beam had dropped 3 inches.
PXL 20221007 142020614.MP
The rot continued downwards.
PXL 20220721 145545119.MP
From the outside, The deck has a dip showing clearly on topside.
PXL 20220721 145511829.MP
What's that trying to hold up the beam?
PXL 20221014 145641193
Re-building has begun.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20220721 145507213
A close up of the beam showing the notch and the laminate layers separating.
PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too.