PXL 20221014 145641193
Re-building has begun.
PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.
PXL 20221014 135830695.MP
Still more rot. The rest of the wall will be removed.
PXL 20221014 135824201
First beam gone, second braced for removal.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too.
PXL 20221014 124619493
The outside walls are damaged as well.
PXL 20221007 142047567
And the damage continues.
PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too.
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20221007 142020614.MP
The rot continued downwards.
PXL 20221006 194725748
Yes, that crowbar was easily pushed through the beam.
PXL 20221006 194642176.MP
The damage goes throughout the wall.
PXL 20221006 170853274
Some help was added. The dip in the deck is resolved.
PXL 20221006 154445824
The beam is in bad shape and with the post gone would collapse if not taken care of soon.