PXL 20221006 154445824
The beam is in bad shape and with the post gone would collapse if not taken care of soon.
PXL 20220721 145545119.MP
From the outside, The deck has a dip showing clearly on topside.
PXL 20221014 135830695.MP
Still more rot. The rest of the wall will be removed.
PXL 20220721 145507213
A close up of the beam showing the notch and the laminate layers separating.
PXL 20220721 145511829.MP
What's that trying to hold up the beam?
PXL 20221006 194642176.MP
The damage goes throughout the wall.
PXL 20221007 142020614.MP
The rot continued downwards.
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20221007 142047567
And the damage continues.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221006 154355128
The support post has degraded so it is the consistency of balsa wood. It was removed easily by poking it with a screwdriver!
PXL 20220721 145455644
This is how it was discovered. The Hardyboard had broken off revealing that the beam had dropped 3 inches.
PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too.
PXL 20221014 135824201
First beam gone, second braced for removal.
PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.