
PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too.
PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221007 142047567
And the damage continues.
PXL 20220721 145507213
A close up of the beam showing the notch and the laminate layers separating.