
PXL 20221006 170853274
Some help was added. The dip in the deck is resolved.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20220721 145455644
This is how it was discovered. The Hardyboard had broken off revealing that the beam had dropped 3 inches.
PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too.
PXL 20221006 194725748
Yes, that crowbar was easily pushed through the beam.
PXL 20220721 145507213
A close up of the beam showing the notch and the laminate layers separating.