
PXL 20221014 135824201
First beam gone, second braced for removal.
PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.
PXL 20221006 194725748
Yes, that crowbar was easily pushed through the beam.
PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too.
PXL 20221006 170853274
Some help was added. The dip in the deck is resolved.
PXL 20221006 154422663
The top of the post was a bit better because it was the bottom that sat in the water that couldn't escape.
PXL 20221014 145641193
Re-building has begun.
20130322T120041 IMG 2393-01
PXL 20221014 124619493
The outside walls are damaged as well.
20180515 182414
IMG 2111
IMG 2117
IMG 2108
IMG 2116
IMG 2109