
PXL 20220721 145511829.MP
What's that trying to hold up the beam?
PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.
PXL 20221014 145641193
Re-building has begun.
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221006 194642176.MP
The damage goes throughout the wall.