Creation date / 2022 / All
Choose filters
Cancel
Validate
Choose filters
Validate
Validate
Search tips
Validate

PXL 20221014 145627667
The second beam holding up the stairs would collapse soon.
PXL 20221014 135830695.MP
Still more rot. The rest of the wall will be removed.
PXL 20221014 133700543
Looking from the outside. The support beam holding up the deck and stairs need to be replaced too.
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221006 154422663
The top of the post was a bit better because it was the bottom that sat in the water that couldn't escape.