Creation date / 2022 / All

PXL 20221014 133742945
Obviously, the cap specified by the Architect had not been installed.
PXL 20221014 124619493
The outside walls are damaged as well.
PXL 20221006 154355128
The support post has degraded so it is the consistency of balsa wood. It was removed easily by poking it with a screwdriver!
PXL 20221007 142030892
Rot continues halfway through the wall. This shows how easily the water came in from the top.
PXL 20220721 145507213
A close up of the beam showing the notch and the laminate layers separating.
PXL 20221007 142042185
Looks like the cross members for the deck need to be repaired too.